Air Products – Ammonia Storage Mech 5 Mechanical Package

Air Products – Ammonia Storage Mech 5 Mechanical Package

  • Duration

    150,000 Safe Man Hours Worked

  • Service/Division

    Industrial Construction

Project Details

About This Project

Over 2,500 field welds executed installing 22,000 liner feet of process piping ranging from ½” up to 14” in diameter.

  • Set over 70 pieces of process equipment involving extensive rigging and lift plans
  • Erected and installed 150 tons of structural steel
  • Installed all mechanical piping on 600’ long shipping dock, working over water

Worked 200’ high on one of the largest Ammonia Tanks in the U.S., loading all equipment and piping onto a 2 story, 3,000 SF platform.