Williams – Ultrasonic Meter Skids

Williams – Ultrasonic Meter Skids

  • Location

    Seminary, MS

  • Duration

    12 Months

  • Service/Division

    Midstream

Project Details

About This Project

The scope of this project was to design, fabricate and assemble three ANSI 1500# bi-directional ultrasonic meter skids.

Trade faced challenges related to the sheer size and end location of the project, as the skids required a 10” run, 6” run, 4” run, and 2” run with a bypass and a skid-mounted gas supply line on each. Additionally, the skids were installed near a salt dome, which mandated a nickel coating on the interior of all piping in order to protect it. 

  • First-in-kind ANSI 1500 bi-directional ultrasonic meter skids with ID nickel coating
  • Worked closely with the client to generate and create site-specific design parameters
  • Fabricated and delivered skids on time through many unforeseen challenges 
  • Coordinated logistics and aided customer with commissioning

With no design specs provided, we worked to create one specifically for this project. In the end, however, we were able to coordinate and deliver the project on time.