The scope of this project included fabrication labor, material, and NDE for two SP-211 and SP-212, as shown on drawings provided by Motiva.
Quickly responded with personnel and shop resources
Average fabrication thickness of two inches
The majority of fabrication was 347H heavy wall
Nominal thicknesses of main fabrication reached nearly two inches
Over 600 spools in combined turnaround scope and rebuild scope
Trade worked around the clock to meet both the client’s schedule and specifications, and we were able to finish ahead of schedule with no fabrication errors while adhering to all technical requirements.