Shell Motiva – Alloy

Shell Motiva – Alloy

  • Location

    Convent, LA

  • Duration

    8 Months

  • Service/Division

    Pipe Fabrication

Project Details

About This Project

The scope of this project included fabrication labor, material, and NDE for two SP-211 and SP-212, as shown on drawings provided by Motiva.

  • Quickly responded with personnel and shop resources
  • Average fabrication thickness of two inches
  • The majority of fabrication was 347H heavy wall
  • Nominal thicknesses of main fabrication reached nearly two inches
  • Over 600 spools in combined turnaround scope and rebuild scope
 

Trade worked around the clock to meet both the client’s schedule and specifications, and we were able to finish ahead of schedule with no fabrication errors while adhering to all technical requirements.